公寓 T2出售 在Cerro das Mós - Parque do Moínho - São João
205,000 欧
描述
Lagos Cidade, Lagos
房源编号:33707945
T2 with 82sqm, well located close to the Marina and Avenue. On the 1st floor with elevator, this apartment with east/west sun exposure and new plumbing and double-glazed windows consists of 2 bedrooms with balcony and closets, complete bathroom, living room and kitchen with access to a spacious 20m2 terrace with pantry. Ideal for living, being very close to the center and commerce/services.
1 Bedroom 2 storey townhouse in Lagos, beautifully presented, with private sunny roof top terrace, featuring open plan living room and kitchen on the ground floor, 1 bedroom and 1 bathroom upstairs. A well-designed staircase leads you all the way to the terrace. Presently enlaced by a beautiful climbing bougainvillea flowered up to the roof top. Located in Lagos calm residential area close to old historic walls and in short walking distance to Descobrimentos main avenue below. Town view. Sold furnished.
Deal Homes presents,Luxurious two-bedroom apartment, of new construction, located near shops and services, inserted in a building with 4 floors and with elevator.This apartment is on the 4th floor, consists of:-Entrance hall;-Living room in open-space with kitchen equipped with built-in appliances of good brand and quality;-Two bedrooms with built-in wardrobe, with access to a balcony, being one of the en-suite bedrooms with bath base with Italian shower;-Full social bathroom, with Italian shower;- Balcony in the kitchen area with plenty of space.The apartment is equipped with air conditioning, thermal frames with double glazing, thermolacquered and thermal electric shutters, hydraulic underfloor heating. To note the excellent finishes of good taste and excellent quality.In the basement of the building, a garage enclosed in box and on the terrace, there is a communal pool for the use of all condominium owners.Excellent opportunity to acquire your luxury apartment in the beautiful city of Lagos!Book your visit now!Work with Permit No. 6/2021.Completion of Work scheduled for the 1st quarter of 2025.